[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"health-study-detail:100497059":3},{"organization":4,"armGroups":7,"interventions":7,"overallOfficials":7,"centralContacts":8,"locations":7,"responsibleParty":14,"collaborators":7,"id":16,"slug":17,"hasResults":18,"nctId":19,"briefTitle":20,"officialTitle":21,"acronym":22,"eligibilityCriteria":23,"healthyVolunteers":18,"sex":24,"minAge":25,"maxAge":7,"enrollmentInfo":26,"targetDuration":7,"studyType":29,"phases":7,"briefSummary":30,"conditions":31,"keywords":34,"overallStatus":39,"whyStopped":7,"lastUpdateSubmitDate":40,"lastUpdatePostDateStruct":41,"startDateStruct":44,"completionDateStruct":46,"leadSponsor":48,"locationsCount":7},{"fullName":5,"class":6},"University Hospital, Strasbourg, France","OTHER",null,[9],{"name":10,"role":11,"phone":12,"phoneExt":7,"email":13},"Pierre GANTNER, MCU-PH","CONTACT","03 69 55 16 32","pierre.gantner@chru-strasbourg.fr",{"type":15,"investigatorFullName":7,"investigatorTitle":7,"investigatorAffiliation":7,"oldNameTitle":7,"oldOrganization":7},"SPONSOR","100497059","analysis-of-the-persistence-reservoir-and-hiv-latency-100497059",false,"NCT05752318","Analysis of the Persistence, Reservoir and HIV Latency","APRIL Study: Analysis of the Persistence, Reservoir and HIV Latency","APRIL","Inclusion Criteria:\n\n* HIV-infection\n* Adults (\\>18 years)\n* Social insurance\n* Informed consent\n\nExclusion Criteria:\n\n* HIV-uninfected\n* \\\u003C18 years\n* Lack of social insurance\n* Lack or withdraw of consent","ALL","18 Years",{"count":27,"type":28},500,"ESTIMATED","OBSERVATIONAL","The APRIL study aims at analyzing HIV reservoirs, latency and persistence on antiretroviral therapy. It enrolls HIV-infected adults providing blood samples of which peripheral blood mononuclear cells are stored. The frequency, phenotype and inducibility of HIV-infected cells are then analyzed. These parameters may vary across the different clinical and therapeutic settings.",[32,33],"HIV Infected Individuals","Informed Consent",[35,36,37,38],"HIV","Reservoir","Latency","Persistence","NOT_YET_RECRUITING","2023-02-28",{"date":42,"type":43},"2023-03-02","ACTUAL",{"date":45,"type":28},"2023-02-27",{"date":47,"type":28},"2027-02-25",{"name":5,"class":6}]